Pre-installation and package contents – Rose Electronics RackView Dual Rail User Manual
Page 5

Page 5 KVM Rack Drawer Dual Rail 15”-17”-19” WWW.ROSE.COM
Pre-Installation and Package Contents
Before Installation:
It is very important to mount the equipment in a suitable cabinet or on a stable surface.
Make sure the mounting location has good ventilation, is out of direct sunlight, and away from
sources of excessive dust, dirt, heat, water, moisture and vibration.
Unpacking:
The equipment comes with the standard parts shown in package content. Check and make sure
they are included and in good condition. If anything is missing, or damaged, contact your supplier
immediately.
Package Contents:
1 x Rackview Unit
2 x Mounting bracket and slide rail sets
1 x Power Cable
1 x User Manual
2 x Keys
1 x Set of screws and washers
1 x set CPU Interface Cables
Pre-Installation:
a) Preparation
•
Check all peripherals against the packing list. Make sure that the unit was not damaged during the
shipping process. If you encounter any problems, please contact your reseller
•
Before installation, make sure all peripherals and computers have been turned off.
•
The cabinet depth range must be between 19.84” - 39.37” (504 - 1000mm) for the 15” and 17” models,
and between 21.8” – 39.37” (554 – 1000mm) for the 19” model. Contact your reseller for deeper
cabinet application.
•
Reliable grounding of rack-mounted equipment should be maintained. Particular attention should be
given to power supply connections other than direct connections to the branch circuit.
b) Power On Procedure
•
Power on the Rackview (see power switch on back panel)
•
Power on the KVM Switch or other connected product
•
Power on the CPU
c) Cleaning Your Monitor
To clean your LCD safely, please follow these steps:
•
Disconnect the power cord.
•
Gently wipe the surface using a clean, dry microfiber cloth. Use as little pressure as possible.