MCZ Goya User Manual
Page 9

INSTALLATION AND USE MANUAL
Chapter 3
GOYA
page
9
Chapter 3
Technical service – all rights reserved by mcz spa
Reproduction prohibited
3.4. PHASE 3 – PREPARATION OF WALL FOR RECESSED INSTALLATION
Prepare the recessed installation wall with fireproof material, such as fireproof plasterboard. Provide an opening
of 685X645 mm, 350 mm above the floor.
64
5
685
35
0
PARETE D'INCASSO
It is advisable to make 4 pass-through holes D=13 mm in the positions shown in the drawing. The holes are used
to facilitate the fastening of the Goya frame to the wall for recessed installation. It is advisable to check on-site
the exact position by placing the Goya frame near the wall.
20
0
48
0
361
FORO
Ø13 MM
361
FORO
Ø13 MM
SCHEMA POSIZIONE FORI