Phase 4 - assembly of goya frame – MCZ Goya User Manual
Page 10

INSTALLATION AND USE MANUAL
Chapter 3
GOYA
page
10
Chapter 3
Technical service – all rights reserved by mcz spa
Reproduction prohibited
3.5. PHASE 4 - ASSEMBLY OF GOYA FRAME
Insert 4 butterfly anchors (included) in the wall for recessed installation at the holes made in the previous phase
as shown in the diagram.
FORO
Ø13 MM
DADO PER
BLOCCAGGIO
BOCCOLA
DADO
CIECO
RONDELLA
FARFALLA
PARETE
FASE 1
FASE 2
FASE 3
FASE 4
FASE 5
FASE 6
6
Phase 1: close the butterfly
Phase 2: insert the butterfly in the hole D=13 mm
Phase 3: screw until allowing opening of the butterfly in the rear part
Phase 4: cause the butterfly to adhere to the rear part
Phase 5: screw until the entire bush is in the hole and flush with the wall. The flaring makes this possible
Phase 6: lock the position in the rear part with the locking nut. Remove the washer and solid nut