MCZ Gaugin User Manual
Page 15

INSTALLATION AND USE MANUAL
Chapter 3
GAUGUIN
page
15
Chapter 3
Technical service – all rights reserved by mcz spa
Reproduction prohibited
Move the assembled cladding near FormaPuro95. Perforate the wall for recessed insertion at the threaded bars
on the rear side of the slate frame. Secure from the inside with the same number of flanged nuts M5.