Phase 3 – wall for recessed installation – MCZ Gaugin User Manual
Page 11

INSTALLATION AND USE MANUAL
Chapter 3
GAUGUIN
page
11
Chapter 3
Technical service – all rights reserved by mcz spa
Reproduction prohibited
3.5. PHASE 3 – WALL FOR RECESSED INSTALLATION
Prepare the wall for recessed installation using fireproof material, such as fireproof plasterboard, and at least 3
steel uprights. For greater safety, you can use 6 uprights, inserted two by two). Provide an opening of 1060X570
mm, 160 mm from the floor (see drawing). The steel uprights must be placed vertically in the positions shown
(see drawing).
57
0
16
0
1060
MONTANTE ACCIAIO
MONTANTE
ACCIAIO
FILO FORO
90
CENTRO
MONTANTE
290
CENTRO
MONTANTE