Installation and assembly – MCZ Stripe Overnight User Manual
Page 21

19
4-INSTALLATION AND ASSEMBLY
Proceed with the installation as follows:
• Place the two parts E on the base of the smoke fitting.
• Place part F on the upper part of item E.
• Place part D on the right side of part E and part C on the left side.
Place the following on top of these parts, which form the base:
• Part A (4 items in all).
• Part B interlocks on part A (4 items in all).
SIDE VIEW
FRONT VIEW
REAR VIEW
Technical Dept. - All rights reserved - Reproduction is prohibited
See also other documents in the category MCZ Stoves:
- Powersystem (53 pages)
- Powersystem (56 pages)
- Vega '05 (Box Pellet) (61 pages)
- Boxtherm 70 Pellet (52 pages)
- Ego 2.0 AIR Oyster (76 pages)
- Thema (76 pages)
- Nasik (68 pages)
- Ego 2.0 AIR Oyster (75 pages)
- Star COMFORT AIR (60 pages)
- Kaika Oyster (57 pages)
- FC700-715 - 180+180 m3/h (17 pages)
- Flat (60 pages)
- Saturn '05 (62 pages)
- Philo (46 pages)
- Vivo 80 Pellet (61 pages)
- Tube 2013 (56 pages)
- Vivo 80 Pellet Comfort Air - 2012 (57 pages)
- Vivo 90 Pellet Comfort Air (64 pages)
- Yari MULTIAIR (55 pages)
- Polar HYDRO (65 pages)
- Suite HYDRO 22 kW High Efficiency (44 pages)
- Suite HYDRO 22 kW High Efficiency (48 pages)
- Duo HYDRO AIR High Efficiency (40 pages)
- Duo HYDRO AIR High Efficiency (52 pages)
- Flux HYDRO High Efficiency (44 pages)
- Swing HYDRO (52 pages)
- Swing HYDRO (40 pages)
- Toba HYDRO/S 22 (44 pages)
- Toba HYDRO/S 22 (52 pages)
- Vivo 80 Pellet HYDRO (74 pages)
- Zenit (27 pages)
- Veld (30 pages)
- Stub Overnight (48 pages)