Using the appliance, Electrical connection, Warming the stones up – Silvercrest SHS 220 A1 User Manual
Page 52: Gb mt
50
SHS 220 A1
GB
MT
Electrical connection
Before connecting the appliance, compare the connection data (voltage
■
and frequency) on the rating plate of the appliance with that of your power
supply network. This data must be compatible to avoid possible damage to
the appliance.
Check to ensure that the appliance's connection cable is not damaged and
■
that it has not been laid over hot surfaces and/or sharp edges.
Ensure that the connection cable is not tightly stretched or kinked.
■
Do not allow the power cable to hang over edges (trip wire eff ect).
■
Using the appliance
Before the fi rst use, clean the appliance and all accessories as described in
■
the chapter "Cleaning and Care".
Warming the stones up
After you have placed the appliance at a suitable location...
Place the stones
1)
2 3 on the warm-up pins 7 of the warm-up station 4.
Place the cover
2)
1 on the warm-up station 4.
Insert the plug into a power socket.
3)
Set the temperature selector
4)
5 to the desired heat level:
1 = lukewarm (approx. 50°C)
2 = warm (approx. 60°C).
The control lamp 6 glows.
Wait until the stones
5)
2 3 have been warmed. Depending on the ambient
temperature, the warming of the stones 2 3 can take up to approx.
45 minutes.
When the stones
6)
2 3 have reached the set temperature, after about
45 minutes, turn the temperature selector 5 to the level "0".
The control lamp 6 goes out.
Remove the plug from the mains power socket.
7)
57187_LB5.indb Abs3:50
57187_LB5.indb Abs3:50
20.04.2011 11:37:59 Uhr
20.04.2011 11:37:59 Uhr