Preparation for use (fig. a+b) – Silvercrest Z30412-DK User Manual
Page 175

177
GB/MT
The energy cost meter is now ready for use.
Preparation for use
(Fig. A+B)
Note: Ensure that the energy cost meter
and the consumer device are switched
on, so that measurements can be taken.
Note: The LC display
1
switches off
after approx. 3 minutes automatically if
the energy cost meter is inserted into a
mains outlet socket but no button has
been pressed. The data is retained. You
can reactivate the LC display
1
by
pressing the FUNCTION
2
, SET
3
or
SELECT
6
button.
Note: The LC display
1
switches off
after approx. 1 minute automatically if
the energy cost meter is removed from the
mains outlet socket. The data is retained.
66149_silv_Energiekosten-Messgerät_Content_ES-IT-PT-GB.indd 177 25.05.11 12:21