beautypg.com

0 checklist for proper installation, Hecklist, Roper – Emerson Liebert XDCF User Manual

Page 22: Nstallation

background image

Checklist for Proper Installation

18

6.0

C

HECKLIST

FOR

P

ROPER

I

NSTALLATION

___ 1. Liebert XDCF modules are securely attached to the cabinet.
___ 2. Piping from Liebert XDP or Liebert XDC, with isolation valves, properly connected to each

Liebert XDCF module.

___ 3. Flex piping connections to prefabricated header assembly are secure and according to

specifications.

___ 4. Check the R-134a refrigerant charge.
___ 5. System checked for leakage.
___ 6. Run system and verify that the Liebert XDP or Liebert XDC and the Liebert XDCF modules

operate properly.

___ 7. Piping is insulated.