beautypg.com

Preparation before installation, Unpack the package – Ecom Instruments ECOM-EF24F2G User Manual

Page 14

background image

2 Preparation before Installation

6

2

Preparation before Installation


Unpack the Package


Before you begin the installation of ECOM-ES24F2G Fast Ethernet Switch, make sure that you
have all the necessary accessories that come with your package. Follow the steps below to unpack
your package contents:

1. Clear out an adequate space to unpack the package carton.
2. Open the package carton and take out the contents carefully.
3. Put back all the shipping materials such as plastic bag, paddings and linings into the package

carton and save them for future transport need.


After unpacking and taking out the entire package contents, you should check whether you have got
the following items:

ECOM-ES24F2G Fast Ethernet Switch

One AC power cord

Rack-mounting kit (screws and mounting brackets)

Support CD-ROM (The PDF version of this User’s Manual can be found within)


If any of these above items is missing or damaged, please contact your local dealer for replacement.

Ecom ES24F2G Gigabit Ethernet Switch User’s Manual V1.0