beautypg.com

Installation, 484mm) high lintel – Enviro Venice User Manual

Page 15

background image

Installation

Please read and understand these instructions before installing pedestal or ash pan and leg option.

Failure to follow these instructions carefully could cause personal injury or property damage. All screws

are pre-installed on the base of the unit.

R

EMOVAL

F

ROM

P

ALLET

:

• Remove the bricks from the unit before starting.

• Remove the two (2) lag bolts (shown in Figure 6) that

secure the unit to the pallet from inside the firebox.

Note: Before the bricks are installed, rivets

(Figure 2) must be placed in the two (2)

holes (shown in Figure 7) in the firebox that

lag bolts came out of. This is done to make

unit burn more efficiently.

Figure 7:

Rivet.

Figure 6: Bolts to remove.

15

M

ODIFICATIONS

F

OR

I

NSTALLATION

WITH

19

1

/

16

” (484

MM

) H

IGH

L

INTEL

:

Insert Cabinet Top

Air Deflector

Figure 9: Removing Air Deflector onto Cabinet Top.

Figure 8: Removing Cabinet Top from Unit.

The Venice has a factory height of 19

9

/

16

” (497mm) and

it can be reduced to 19

1

/

16

” (484mm) by modifying the

unit and the surround panel.
Insert Unit:
1. Remove the thirteen T-20 screws holding the cabinet

top in place (refer to Figure 8).

2. Remove the cabinet top and flip it onto its top.
3. Remove the Air Deflector (shown in Figure 9) by

removing the two (2) T-20 screws.

4. Re-install the cabinet top onto the unit. The screw

holes along the top of the unit should now line up

with the top set of holes on the cabinet top.

This manual is related to the following products: