Transporting, Operation, Transporting a unit – Exmark Ultra VAC LAZER Z User Manual
Page 17
Operation
tube to provide minimum obstruction to flow.
Make sure that the upper and the lower ends are
oriented properly as the tubes are assembled.
(Parting lines should roughly be lined up.)
Figure 18
1.
Drill the holes here
28. Slide the lower end of the tube assembly over the
blower outlet and align the notch with the tube
latch. Latch the tube to the blower.
29. Install the removable weights. Hook the front toe
board weight assembly over the top of the weight
mounting plate and secure with two hairpins
Figure 19).
Weight Quantities
Deck
Size
48 inch
52 inch
60 inch
72 inch
Toe
Board
Weight
3
2
2
1
Caster
Weight
—
—
2
2
Note: The removable weights are heavy. Use
care when lifting them. make sure that you can
hold them securely before lifting them. Use
caution when positioning your hands to that you
Do Not set them down on your hands or fingers.
Figure 19
30. For LZUV3B Units Only:
A. Install the removable caster weights on the
caster arms (see Figure 20).
B. Insert the clevis pin through the bracket hole
and fasten with a hairpin.
C. Tighten knob on weight assembly until the
weight is clamped securely to the caster arm.
Figure 20
For LZUV3B Units Only
1.
Clevis pin
3.
Hairpin
2.
Knob
4.
Caster weight
Transporting
Transporting a Unit
Use a heavy-duty trailer or truck to transport the
machine. Lock brake and block wheels. Securely
fasten the machine to the trailer or truck with straps,
chains, cable, or ropes. Be sure that the trailer or truck
17