beautypg.com

Transporting, Operation, Transporting a unit – Exmark Ultra VAC LAZER Z User Manual

Page 17

background image

Operation

tube to provide minimum obstruction to flow.
Make sure that the upper and the lower ends are
oriented properly as the tubes are assembled.
(Parting lines should roughly be lined up.)

Figure 18

1.

Drill the holes here

28. Slide the lower end of the tube assembly over the

blower outlet and align the notch with the tube
latch. Latch the tube to the blower.

29. Install the removable weights. Hook the front toe

board weight assembly over the top of the weight
mounting plate and secure with two hairpins
Figure 19).

Weight Quantities

Deck
Size

48 inch

52 inch

60 inch

72 inch

Toe
Board
Weight

3

2

2

1

Caster
Weight

2

2

Note: The removable weights are heavy. Use
care when lifting them. make sure that you can
hold them securely before lifting them. Use
caution when positioning your hands to that you
Do Not set them down on your hands or fingers.

Figure 19

30. For LZUV3B Units Only:

A. Install the removable caster weights on the

caster arms (see Figure 20).

B. Insert the clevis pin through the bracket hole

and fasten with a hairpin.

C. Tighten knob on weight assembly until the

weight is clamped securely to the caster arm.

Figure 20

For LZUV3B Units Only

1.

Clevis pin

3.

Hairpin

2.

Knob

4.

Caster weight

Transporting

Transporting a Unit

Use a heavy-duty trailer or truck to transport the
machine. Lock brake and block wheels. Securely
fasten the machine to the trailer or truck with straps,
chains, cable, or ropes. Be sure that the trailer or truck

17

This manual is related to the following products: