beautypg.com

Installation, Pedestal installation, Legs and ash pan installation – Enviro 2100 User Manual

Page 10

background image

Installation

Please read and understand these instructions before installing pedestal or ash pan and leg option.
Failure to follow these instructions carefully could cause personal injury or property damage.All screws

are pre installed on the base of the unit.

P

EDESTAL

I

NSTALLATION

:

L

EGS

A

ND

A

SH

P

AN

I

NSTALLATION

:

• Remove the bricks from the unit before starting.
• Loosen the two (2) carriage bolts that secure the

unit to the pallet. Slide the pallet towards the front

to release carriage bolts from the key holed slots in

the unit. Place the unit on the pallet on its back.

• Slide the pedestal assembly over the bolts located

on the base of the unit using the key holed slots

provided.

• Tighten all four (4) bolts ensuring the pedestal is

properly aligned to the edges of the unit.

• Ensure that the gasket material is properly sealed

before continuing.

• Stand the unit on the pedestal and set the unit in

the location ready for installation.

• If fresh air supply is being supplied from the bottom

of the unit please install the cover plate supplied to

the rear of the pedestal covering the 4 inch (10 cm)

hole.

• Remove the bricks from the unit before starting.
• Loosen the two (2) carriage bolts that secure the

unit to the pallet. Slide the pallet towards the front

to release carriage bolts from the key holed slots in

the unit. Place the unit on the pallet on its back.

• Slide the ash pan assembly over the bolts using

the key holed slots provided and tighten all four

(4) bolts.

• Ensure that the gasket material is properly sealed

before cleaning.

• Carefully remove the cast iron legs from the

packaging and secure each leg with two (2) bolts

provided.

• Secure all four (4) legs, push the leg towards the

center of the stove and align the legs with the

outer edges of the firebox.

• Stand the unit on the legs and set the unit in the

location ready for installation

10