Before use, Start-up (see fig. a), After initial use – Parkside PDNE 4000 A1 User Manual
Page 10: Changing spare parts, Maintenance
10 GB
… / Cleaning and Care / Information about warranty and service processing
… / Before use / Start-up / After initial use / Changing spare parts / Maintenance
Ensure not to exceed the maximum pressure
specified on the machine.
Never carry pneumatic tools by the hose.
Before use
Quick-release socket
Compressed air hose
Quick-release socket
Pressure regulator
Oils
Filter
Quick-opening sleeve
Compressor
ATTENTION! Never start up the air tool with-
out oiling it.
Verify the compressor is positioned on solid
ground.
Check if all hose connections are connected
and secured correctly.
Connect the tool with the air hose.
If no function is detected after switching on de-
spite reaching the maximum pressure, switch the
device back off. Immediately contact the ser-
vice hotline.
Start-up (see Fig. A)
Screw a threaded plug fitting ¼“ (6.35 mm)
into the air tool.
Note: We recommend using Teflon tape to
achieve maximum leak-tightness. Otherwise the
equipment may potentially be unable to produce
its full capacity.
To connect the device to the air hose, never point
the front end (needle head) of the tool at your-
self or others.
Pulling the trigger
6
will start the device.
Release the trigger
6
to stop the device.
Use the needle scaler to remove rust, paint,
lacquier and similar items.
Never use excess force to push the equipment
onto the tool, as this may cause damage.
Applying the equipment at a slight angle and
sliding it across the surface to be cleaned with
a little pressure across the area to be cleaned
for optimal results.
Regulate the air pressure using the air adjusting
screw
4
(next to the air inlet at the bottom of
the device) for optimal results.
After initial use
Once the task has been finished the equipment must
be disconnect from the compressed air supply
5
.
Changing spare parts
The head of the needle scaler must be replaced if
it shows damage or is severely worn. Proceed as
follows:
Using the included hexagon socket screw, loosen
the 4 screws for the head (see Fig. B).
Unscrew the old head using minimal force (see
Fig. C).
Properly dispose of the old head.
Screw in the new head hand tight (see Fig. F).
tighten the 4 screws on the head (see Fig. G).
Maintenance
Following the maintenance information specified
here will ensure a long service life for the product
and trouble-free operation. Your needle scaler
working properly for a long time requires regular
lubrication.
You may choose from the following
options:
With an oil-fog lubricator
A complete maintenance unit includes an oil-fog
lubricator and is attached to the compressor.
43098_par_Druckluft-Nadelentroster PDNE 4000 A1_content_CZ.indd 10
04.06.14 13:17