beautypg.com

Maintenance schedule – Parkside PSE 2800 A1 User Manual

Page 15

background image

15

GB/IE/

CY

11. Maintenance schedule

Please adhere to the following maintenance periods in order to ensure a failure-free operation.
Important. The equipment must be filled with engine oil and fuel before it is started.

Important: The positions marked with “x*“ should only be carried out by an authorized dealer.

Before each
use

After an
operating
period of 20
hours

After an
operating
period of 50
hours

After an
operating
period of 100
hours

After an
operating
period of 300
hours

Checking the
engine oil

x

Changing the
engine oil

For the first
time, then
every 50
hours

x

Checking the air
filter

x

Change the
filter insert if
necessary

Cleaning the air
filter

x

Cleaning the
petrol filter

x

Visual inspection
of the equipment

x

Cleaning the
spark plug

Distance: 0.6
mm, replace if
necessary

Checking and
readjusting the
throttle vale on
the carburetor

x*

Cleaning the
cylinder head

x*

Set the valve play

x*

Anleitung_4152414_GB_IE_CY:_ 26.10.2011 16:31 Uhr Seite 15