Maintenance schedule – Parkside PSE 2800 A1 User Manual
Page 15
15
GB/IE/
CY
11. Maintenance schedule
Please adhere to the following maintenance periods in order to ensure a failure-free operation.
Important. The equipment must be filled with engine oil and fuel before it is started.
Important: The positions marked with “x*“ should only be carried out by an authorized dealer.
Before each
use
After an
operating
period of 20
hours
After an
operating
period of 50
hours
After an
operating
period of 100
hours
After an
operating
period of 300
hours
Checking the
engine oil
x
Changing the
engine oil
For the first
time, then
every 50
hours
x
Checking the air
filter
x
Change the
filter insert if
necessary
Cleaning the air
filter
x
Cleaning the
petrol filter
x
Visual inspection
of the equipment
x
Cleaning the
spark plug
Distance: 0.6
mm, replace if
necessary
Checking and
readjusting the
throttle vale on
the carburetor
x*
Cleaning the
cylinder head
x*
Set the valve play
x*
Anleitung_4152414_GB_IE_CY:_ 26.10.2011 16:31 Uhr Seite 15