beautypg.com

Assembly, Plastic shield installation, Nylon line head installation – Echo GT-251E User Manual

Page 10

background image

10

NYLON

LINE

HEAD

INSTALLATION

1. Remove plastic threaded shaft sleeve from threaded PTO shaft.

2. Align locating hole in upper plate with hole in bearing housing and

insert 5 mm (3/16 in.) diameter locking tool (A).

3. Place large washer (B) then line head (C) on threaded shaft,

followed by small metal washer (D) and locknut (E).

4. Install 3/8-24 locknut using 14.5 mm (9/16 in.) wrench. Turn locknut

clockwise, and tighten securely.

IMPORTANT
Remember to remove the locking tool.

C

B

A

A

B

C

D

E

A

SSEMBLY

Tools Required: Locking Tools (2), Wrench 17 x 14.5 (9/16 in.)

Parts Required: Rapid Loader

TM

Head, Large washer, Small washer,

3/8-24 Locknut, (2) Pre-cut Nylon Line 8 in. x .080 in.,
Plastic Shield Assembly

WARNING

DANGER

Cut-off knife on debris shield has sharp edges. Avoid contact
when installing or removing line head.

PLASTIC

SHIELD

INSTALLATION

1. Remove cardboard tube.

2. Remove wing nut (C), washer (B), and bolt (A).

3. Snap the shield over the bearing housing.

4. Install bolt (A), washer (B) and wing nut (C).