Magnum Energy Charge Controller Bracket (MP-CCB) User Manual
Page 2

MP-CCB Instruction Sheet
2
© 2014 Magnum Energy, Inc.
Refer to Figure 2 to locate the holes you will use to attach the bracket to
the enclosure and to mount the controller to the bracket. Use the provided
thread forming screws (T20 Torx drive) to pre-thread the selected mounting
holes. It is easier to do this now rather than after it is installed.
After pre-threading the particular bracket hole(s), attach the bracket to the
enclosure. Before you mount the charge controller to the attached bracket,
remove the appropriate knockout from the side of the controller and an
adjacent knockout on the side of the enclosure. This allows you to use a 1”
close nipple with two locknuts to secure the charge controller to the enclosure
(in addition to the bracket), and provides a path to run the necessary wiring
between the two units. Mount the controller to the attached bracket using
the supplied hardware. Insert the close nipple through the knockouts and
secure with the locknuts.
Info: It may take three locknuts on the close nipple to anchor the
controller to the enclosure. An additional locknut may be required
between the enclosure and the controller to act as a spacer. Also,
a standard 1” plastic bushing should be used on the nipple ends to
protect the wire insulation as it enters/exits the nipple.
Figure 2, Mounting Holes