Folding the screen material for proper packing, Attaching the frame to its supports – Elite Screens REV043010-JA User Manual
Page 7
Rev043010-JA
Folding the Screen material for proper packing
Please observe the following precautions before folding up the screen material.
1. Do not bring the viewing surface into contact with chemical solvents, sharp or abrasive objects,
painted, varnished or plastic finished items.(*See the cleaning instructions for exceptions to this)
2. Make certain that the screen is laid out on a dry, clean and flat surface.
Folding up the screen:
Lay out the screen with the viewing surface facing up and cover it with flat (not crumpled) tissue or packing
paper that is clean and unprinted. *Note: Do not ever use abrasive paper, newspaper or any printed
material on your projection screen.
1. With the viewing surface facing up, fold the fabric in half from top to bottom. When folding, make
certain that the viewing surface does not come into contact with the black binding, grommets or snap
buttons. *Note: The screens are shipped from production with tissue paper in the folds that should be
retained for future use.
Attaching the Frame to its Supports
1. Always use at least two locking bolts through the T-Leg Support, the Spacer and into the Frame on each
side.
2. Height can be adjusted in 8” increments up or down. Normal screen height is 44” from the bottom of the
frame to the floor.
3. Reverse this process to dismantle and pack away the screen.
locking bolt
frame
leg
frame spacer
snap latch button