beautypg.com

Rack setup for the ebm – Eaton Electrical Extended Battery Module (EBM) 9140 User Manual

Page 24

background image

INSTALLATION

EATON Powerware

®

9140 EBM User’s Guide

S 164201623 Rev A FINAL DRAFT 2006 July 14

18

Rack Setup for the EBM

NOTE Mounting rails are required for each individual cabinet.

NOTE The recommended configuration is to install the EBM(s) in the lower part of the rack,
with the UPS directly above the EBM(s).

To install the EBM rail kit:

1.

Select the proper holes in the rack for positioning the EBM in the
rack (see Figure 1).

NOTE The EBM takes up position 1 through position 9.

Position 2

Position 5

Position 8

Screw

Positions for

Rail and Front

Mounting

Bracket

Position 4

Position 3

Bottom of Rack
or Top of Other

Cabinet

Figure 1. Front Rail Screw Positions for the EBM