Installing the fibre channel board – Grass Valley PDR 200 Fibre Channel User Manual
Page 31

Installing the Fibre Channel Board
PDR 200 Fibre Channel Installation Manual
19
Installing the Fibre Channel Board
Installing the Fibre Channel board consists of the tasks listed below.
• Installation.
• Reinstalling board hold-down brackets.
• Installing the PCI Interconnect board.
• Replacing the Profile covers.
• Replacing the Profile chassis into the rack.
• Connecting/reconnecting external cables and power cord.
NOTE: The Fibre Channel board must be installed in board slot J8, adjacent
to the MEDR board in board slot J9. See Figure 11 for board slot IDs.
Figure 11. Board Slot IDs (Rear Panel)
0033-3
J1
J17
J13
J16 J15 J14
J6
J7
J4 J3 J2
J5
J12 J11
J9 J8
J10
See also other documents in the category Grass Valley Equipment:
- LDK 5302 (24 pages)
- SFP Optical Converters (18 pages)
- 2000GEN (22 pages)
- 2011RDA (28 pages)
- 2010RDA-16 (28 pages)
- 2000NET v3.2.2 (72 pages)
- 2000NET v3.1 (68 pages)
- 2020DAC D-To-A (30 pages)
- 2000NET v4.0.0 (92 pages)
- 2020ADC A-To-D (32 pages)
- 2030RDA (36 pages)
- 2031RDA-SM (38 pages)
- 2041EDA (20 pages)
- 2040RDA (24 pages)
- 2041RDA (24 pages)
- 2042EDA (26 pages)
- 2090MDC (30 pages)
- 2040RDA-FR (52 pages)
- LDK 4021 (22 pages)
- 3DX-3901 (38 pages)
- LDK 4420 (82 pages)
- LDK 5307 (40 pages)
- Maestro Master Control Installation v.1.5.1 (455 pages)
- Maestro Master Control Installation v.1.5.1 (428 pages)
- 7600REF Installation (16 pages)
- 7600REF (84 pages)
- 8900FSS (18 pages)
- 8900GEN-SM (50 pages)
- 8900NET v.4.3.0 (108 pages)
- Safety Summary (17 pages)
- 8900NET v.4.0.0 (94 pages)
- 8906 (34 pages)
- 8911 (16 pages)
- 8900NET v.3.2.2 (78 pages)
- 8914 (18 pages)
- 8912RDA-D (20 pages)
- 8916 (26 pages)
- 8910ADA-SR (58 pages)
- 8920ADC v.2.0 (28 pages)
- 8920ADC v.2.0.1A (40 pages)
- 8920DAC (28 pages)
- 8920DMX (30 pages)
- 8920ADT (36 pages)
- 8920MUX (50 pages)
- 8921ADT (58 pages)