beautypg.com

Installing the scsi cable, Scsi cable installation in a 2-channel pdr 200 – Grass Valley PDR 200 9 GB Disk Drive Upgrade User Manual

Page 17

background image

Installing the SCSI Cable

PDR 200 9GB Disk Drive Upgrade

7

Installing the SCSI Cable

There are two possibilities for installing the SCSI cable:

• You are installing the upgrade in a 2-channel PDR200.

• You are installing the upgrade in a 4-channel PDR200.

SCSI Cable Installation in a 2-channel PDR 200

In a 2-channel PDR200, the four drives you are installing are controlled by the
second SCSI port on the Master EDR. To install the SCSI cable:

1. Remove the adhesive backing on the cable clamp and attach it to the top of

the power supply parallel to and adjacent to the existing clamp.

2. Connect one end of the SCSI cable to the unused connector on the SCSI

backplane. See Figure 4.

Figure 4. 2-channel PDR200 SCSI Cable Installation

3. Position the cable in the clamp so that both SCSI cables are parallel.

4. Connect the free end of the cable to the SCSI header connector on the rear of

the Master EDR board (Figure 4).

5. Dress the SCSI cables through the channel at the right of the fan carrier tray.

9979-4