Ascaso BARISTA User Manual
Page 7
![background image](https://www.manualsdir.com/files/812182/content/doc007.png)
7
BARISTA 2GR
BARISTA PRO 2GR
BARISTA PRO 3GR
Voltage
230 V (1-phase) / 380 V (three-phase)
Power
3500 W
3500 W
5550 W
Boiler
Maximum pressure
Operating pressure
Capacity
0.18/1.8 MPa/bar
0.12/1.2 MPa/bar
13 l
0.18/1.8 MPa/bar
0.12/1.2 MPa/bar
13 l
0.18/1.8 MPa/bar
0.12/1.2 MPa/bar
18 l
Exchanger
Maximum pressure
Operating pressure
Capacity
1.20/12 MPa/bar
0.84/9 MPa/bar
0.5 l (x2)
1.20/12 MPa/bar
0.84/9 MPa/bar
0.5 l (x2)
1.20/12 MPa/bar
0.84/9 MPa/bar
0,5 l (x3)
Dimensions
(W/D/H)
700/535/465 mm
700/535/465 mm
920/535/465 mm
Weight
60 Kg
63 Kg
85 Kg
Water supply
3/8’’
3/8’’
3/8’’
Drainage Ø
16 mm
16 mm
16 mm
DIMENSIONS WITH PACKAGING
Dimensions (W/D/H)
810/640/580 mm
810/640/580 mm
1025/640/580 mm
Gross weight
68 Kg
71 Kg
93 Kg
Volume
0.284 m
3
0.284 m
3
0.362 m
3
FEATURES
Filter holder for 1
coffee
1
1
1
Filter holder for 2
coffees
1
1
2
Blind filter
1
1
1
1.5-m drainage
tube
1
1
1
Flexible water-
supply hose
1
1
1
MACHINE FEATURES
Machine description
B$RIST$ series machines are manufactured
for making espresso coffee and hot drinks.
The operating mechanism consists of a
displacement pump inside the machine that
feeds the boiler in which the water is heated.
When the controls are activated, water is sent
in the form of hot water or steam to the external
dispensers, as required.
On models with economiser, the water used
for making drinks is taken as required from the
water mains supply, compressed by the pump,
and heated instantly with steam generated by
the boiler.
The machine comprises a steel frame structure to
which the mechanical and electrical components
are attached. The whole unit is fully covered with
panels made from oven-painted sheet iron and
stainless steel. The coffee-making mechanisms,
knobs, control devices and the coffee-dispensing
groups are on the front of the machine. There is an
area designated for warming cups on the top of
the machine.
4
The power cord must be connected to the pre-
assigned connection in accordance with the
current regulations.
The machine must be connected to a
duly installed earth connection.
$ 5-conductor cable (3 3-phase+neutral+earth)
must be used for the three-phase connection.
$ 3-conductor cable (phase+neutral+earth) must
be used for the single-phase connection.
WATER CONNECTION
First, connect one end of the drainage tube
supplied with the machine to the chamber beneath
!
the machine’s drainage tray.
Fit the other end to the previously installed general
drainage outlet.
Then connect the flexible hose (3/8” H
connection) to the pump and the water supply. If
a water treatment system is installed, connect the
hose to the system’s outlet.
IMPORTANT: Do not supply the
coffee machine with water with a
hardness of under 10
o
f.
8pon establishing the water supply and drainage
connections, open the valve or tap to fill the boiler.
!
1
2
3
10
11
5
7
7
9
6
6
8
4
H
B
$
INSTALLATION
Installation, maintenance and repair of machines
may only be performed by qualified personnel.
The surface upon which the machine is placed
must be properly level, dry and stable.
Machines come with height-adjustable feet.
To ensure proper use, the machine must be
installed in places where the surrounding
temperature is between +5ºC/+32ºC and where
humidity does not exceed 70%.
$ free space should be left around the machine for
maintenance work and for the coffee grinder.
ELECTRICAL CONNECTION
The machine comes ready for connection in
accordance with the required specifications.
Before connecting the machine, make sure that
the data on the machine nameplate correspond to
the characteristics of the power supply.
5
ENGLISH
1
espresso
2
espressos
1 lungo
2 lungo Continuous
coffee /
Programming