Amer Networks SGD8 User Manual
Page 9
7
U
NPACKING AND
S
ETUP
This chapter provides unpacking and setup information for the Switch.
Unpacking
Open the shipping carton of the Switch and carefully unpack its contents. The carton
should contain the following items:
z
One SGD8 8-Port 10/100/1000Mbps Gigabit Ethernet Switch
z
Four rubber feet with adhesive backing
z
One AC power cord
z
This user’s guide
If any item is found missing or damaged, please contact your local reseller for
replacement.
Setup
The setup of the Switch can be performed using the following steps:
z
The surface must support at least 5 kg.
z
The power outlet should be within 1.82 meters (6 feet) of the device.
z
Visually inspect the power cord and see that it is secured fully to the AC
power connector.
z
Make sure that there is proper heat dissipation from and adequate ventilation
around the Switch. Do not place heavy objects on the Switch.
Desktop Installation
When installing the Switch on a desktop or shelf, the rubber feet included with the
device must be attached first. Attach these cushioning feet on the bottom at each
corner of the device. Allow enough ventilation space between the device and the
objects around it.