Eaton Electrical Powerware BladeUPS Bar User Manual
Page 16
![background image](/manuals/79375/16/background.png)
INSTALLATION
EATON Powerware
®
BladeUPS
®
Bar Installation Guide
S 164201723 Rev P01
12
16. Install two M4
×8 pan-head screws into the tab on the wireway
floor, securing the base of the bar to the wireway. See Figure 7.
Torque the screws to 1.7 ± 0.2 Nm (15 ± 2 lb in).
Rear of Rack
Wireway Floor Tab
(above bar base sheetmetal)
M4
×
8 Pan-Head Screws
(2 places)
Figure 7. Wireway Tab Attachment