8 tube loading – Watson-Marlow 114 User Manual
Page 11

Watson-Marlow Alitea 114 pumpheads: operating instructions
11
8 Tube loading
Lift the flip top until fully open.
Select enough tube length for the curve of the pump track. Place the tube
between the rotor rollers and the track, pressed against the pumphead inner
wall. The tube must not be twisted or stretched against the rollers.
Lower the flip top until it clicks into its fully closed position. The track closes
automatically and the tube is stretched correctly as it does so.
Click!
Switch off the pump before tube loading.
Check that the tube holders on both sides of the pumphead are correctly set for the
size of tube you are using.
114DV, 114DVP
See also other documents in the category Watson-Marlow Pumps:
- 323Dz (53 pages)
- 620SN (100 pages)
- Bredel 25 (76 pages)
- APEX35 (72 pages)
- Bredel 80 (76 pages)
- Bredel 15 (68 pages)
- 520Bp (107 pages)
- 323D (48 pages)
- EBU250 (8 pages)
- FF20 (24 pages)
- MR-Series (52 pages)
- GD30P (14 pages)
- EC 60 (28 pages)
- PetroProof Series (49 pages)
- Qdos30 Universal (40 pages)
- Qdos60 Universal 110V Logic (78 pages)
- 120S/DM3 (36 pages)
- 120F/DV (26 pages)
- SP50 (86 pages)
- 101U (14 pages)
- 505BA (21 pages)
- 700 series (11 pages)
- Qdos60 Profibus (66 pages)
- 521CC (47 pages)
- 401U (12 pages)
- 620RE4A (11 pages)
- 405U (13 pages)
- 624S (46 pages)
- Bredel 2100 (96 pages)
- Bredel 2100 (92 pages)
- 701 (25 pages)
- 840 (13 pages)
- 505LGA (11 pages)
- 620RE4 (19 pages)
- 205U (13 pages)
- SPS (142 pages)
- 505U (19 pages)
- 704S (17 pages)
- 621 Trio (11 pages)
- 313T (16 pages)
- 624Di (37 pages)
- 505Di (39 pages)
- 501CC (17 pages)
- 504Du (31 pages)
- 504Du (30 pages)