701r, 701rx, 701rg, 701re, 701rex, Pumphead installation, Tube loading – Watson-Marlow 704U User Manual

Page 8: 18 tube loading

background image

Watson-Marlow Bredel E-Manuals

http://www.watson-marlow.it/pdfs-global/m-704su-gb-03.htm[10/07/2012 14:21:14]

Weight

31kg

Noise

85dBA at 1m

Standards

EN60529 (IP55)

Machinery Directive: 98/37/EC EN60204-1

Low Voltage Directive: 73/23/EEC EN61010-1

EMC Directive: 89/336/EEC EN50081-1/EN50082-1

Specific drive performance details such as loaded drive speed variation against mains

supply voltage fluctuation and drive stability from a cold start to normal operating

temperature are available on request. For further information please contact Watson-

Marlow Technical Support.

17 701R, 701RX, 701RG, 701RE, 701REX

Pumphead installation

A correctly engineered installation will promote the best possible tube life, so please ensure

that the following guidelines are followed:

On variable speed models please note that the mechanical speed variator must not be

adjusted when the motor is not running.

Do site the fluid reservoir above the pump wherever possible.

Do keep delivery and suction lines as short and direct as possible.

Do use gradual sweeping bends in installation pipe work with minimum radius equal to five

times the tubing diameter. Avoid tight pipeline bends, pipe reducers and excessive lengths

of smaller bore tubing than that in the pumphead, particularly in pipelines on the suction

side.

Do ensure that there is always a minimum of one metre of smooth bore flexible tubing

connected to the discharge port of the pumphead. This will help minimise any impulse

losses and pulsation in the pipeline. This is especially important with viscous fluids and

rigid pipework.

Do use suction and delivery pipelines with a bore equal to or larger than the bore of the

tube fitted in the pumphead. When pumping viscous fluids, the losses caused by increased

friction can be overcome by using pipe runs with a cross sectional area several times

greater than the pumping element.

Do fit an over-length pump tube in the system to allow its position to be varied relative to

the rotor. This will extend tube life and minimise the downtime of the pumping circuit.

Do ensure that connecting pipe work and fittings are suitably rated to handle the predicted

pipeline pressure.

If rigid pipe work comes in close proximity to the pumphead, a drop out section of pipe

work will simplify tube replacement.

Do keep the pumphead rollers and track clean.

If unsure of an installation please contact your local Watson-Marlow Technical Support

Office for further assistance.

All performance figures in this operating instruction relate to peak pipeline pressures. Peak

pressure is not always accurately shown by oil-filled analogue pressure gauges as damping

of the gauge needle occurs. The pressure being recorded using an analogue gauge may

only be 75% of true peak pressure. For accurate peak pressure measurement a digital

pressure transducer should be used.

18 Tube loading

T704U and 704S pumps can be operated with a 701R continuous tubing pumphead or with

a 701RE pumphead fitted with Watson-Marlow LoadSure tube elements. For both

pumphead types, extension "X" pumphead options are available.