2 commissioning – Watson-Marlow Bredel 265 User Manual
Page 33
![background image](https://www.manualsdir.com/files/808887/content/doc033.png)
COMMISSIONING
33
6.2
Commissioning
1.
Connect the pipework.
2.
Make sure that there are no obstructions such
as closed valves.
3.
Switch on the hose pump.
4.
Check the rotation direction of the pump rotor.
5.
Check the capacity of the hose pump. If the
capacity differs from your specification, follow
the instructions in chapter
11
or consult your
Bredel representative.
6.
Check the hose pump in accordance with points
1 to 4 of the maintenance table from §
8.2
.
This manual is related to the following products:
See also other documents in the category Watson-Marlow Pumps:
- 323Dz (53 pages)
- 620SN (100 pages)
- Bredel 25 (76 pages)
- APEX35 (72 pages)
- Bredel 80 (76 pages)
- Bredel 15 (68 pages)
- 520Bp (107 pages)
- 323D (48 pages)
- EBU250 (8 pages)
- FF20 (24 pages)
- MR-Series (52 pages)
- GD30P (14 pages)
- EC 60 (28 pages)
- PetroProof Series (49 pages)
- Qdos30 Universal (40 pages)
- Qdos60 Universal 110V Logic (78 pages)
- 120S/DM3 (36 pages)
- 120F/DV (26 pages)
- SP50 (86 pages)
- 101U (14 pages)
- 505BA (21 pages)
- 700 series (11 pages)
- Qdos60 Profibus (66 pages)
- 521CC (47 pages)
- 401U (12 pages)
- 620RE4A (11 pages)
- 405U (13 pages)
- 624S (46 pages)
- Bredel 2100 (92 pages)
- 701 (25 pages)
- 840 (13 pages)
- 505LGA (11 pages)
- 620RE4 (19 pages)
- 205U (13 pages)
- SPS (142 pages)
- 505U (19 pages)
- 704S (17 pages)
- 621 Trio (11 pages)
- 313T (16 pages)
- 624Di (37 pages)
- 505Di (39 pages)
- 501CC (17 pages)
- 504Du (30 pages)
- 504Du (30 pages)