Thermon ET-7C User Manual
Page 2

Installation Instructions for FP-BN
Cut and remove primary insulation jacket.
Cut and remove heating element and fiberglass over-
lay. Push any remaining heating element wire under the
primary insulation jacket.
Cut and remove pairing jacket. Do not cut bus wire insulation.
4.
3.
2.
Slide the metallic braid back from the end of the cable.
Cut the cable 3” from the bus connection.
1.
2
See also other documents in the category Thermon Hardware:
- WMK Terminator (4 pages)
- Electric Heat Tracing (12 pages)
- SCTK (5 pages)
- PETK (7 pages)
- ZE-B Beacon Terminator (4 pages)
- ZP-WP Terminator (4 pages)
- ZP-S-WP Terminator (8 pages)
- ZP-XP Terminator (6 pages)
- ZE Terminator (4 pages)
- PETK-3 (5 pages)
- ZL Terminator (7 pages)
- PETK-4 (6 pages)
- HT Heating Module (4 pages)
- MIQ Mineral Insulated Heating Cable v.1 (11 pages)
- MIQ Mineral Insulated Heating Cable v.2 (14 pages)
- ZP-MI-WP Terminator (7 pages)
- ECM-MI-WP Terminator (4 pages)
- ZT-MI-WP Terminator (4 pages)
- ZP-PTD100-XP Terminator (8 pages)
- ZP-PTD100-WP Terminator (7 pages)
- ZT-P-XP (8 pages)
- ZT-P-WP (8 pages)
- PETK-11 (9 pages)
- ECM-R-XP (8 pages)
- ZP-R-WP (4 pages)
- MI (26 pages)
- ZP-R-XP (4 pages)
- ECM-P-XP (8 pages)
- ECM-R-WP (8 pages)
- ECM-Ambient-WP (4 pages)
- ECM-OS (4 pages)
- SafeTrace Steam Tracers (8 pages)
- TraceNet TCM 18 (96 pages)
- Heat Transfer Compounds (8 pages)
- HeetSheet (4 pages)
- ThermoTube Type SL (4 pages)
- Tubing Bundle v.2 (8 pages)
- ET-6C (2 pages)
- FAK-4L Kit (5 pages)
- TBX-3LC (5 pages)
- FAK10A-B-C (4 pages)
- FAK-7 (2 pages)
- FAK-9 (4 pages)
- FAK-1 (4 pages)