6. LIFT SUPPORTING STRUCTURE
The SVS 7HSE Lift should be mounted from six 1/2” rods. The mounting hole locations are marked with a
2-feet (0.6 M) from the support structure to the lift's top mounting holes cross bracing should be installed
between the support rods. Figure 5 shows the cross bracing and the correct height for mounting the lift above
the false ceiling.
Figure 4 Top View
SVS 7HSE Lift Installation Instructions
Page 7 of 16
Figure 5 Cross Bracing & Correct Height