010 construction leveling blade parts list, Installation instructions, Center attachment – Smithco Super Star LE 42-400-A (sn 400356 – Current) Parts & Service Manual User Manual
Page 94
B-17
Center Attachment
42-010 CONSTRUCTION LEVELING BLADE PARTS LIST
REF#
PART#
DESCRIPTION
QUANTITY
1
HB-12-13-500
Bolt
1
/
2
- 13 x 5
4
HNTL-12-13
Lock Nut
1
/
2
- 13
4
2
42-015
Attachment Mount
2
*3
42-203
Attachment Lift
1
*4
HB-38-16-100
Bolt
3
/
8
- 16 x 1
5
HNTL-38-16
Lock Nut
3
/
8
- 16
5
*5
HCP-12-200
Clevis Pin
1
/
2
x 2
2
*6
HHP-18
Bridge Pin
1
/
8
3
*7
HCP-58-250
Clevis Pin
5
/
8
x 2
1
/
2
1
8
18-154
Rod End
1
*9
42-097
Leveling Blade
1
10
42-217
Cylinder Mount
1
11
18-168
90° Elbow
2
12
HCP-34-175
Clevis Pin
3
/
4
- 1
3
/
4
1
13
10-135
Hydraulic Cylinder
1
*
42-010
Construction Leveling Blade (all
other parts are reference only)
INSTALLATION INSTRUCTIONS
1. Remove the cylinder mount (Ref 10) from the machine.
2. Bolt leveling blade (Ref 9) to attachment lift (Ref 3) using five
3
/
8
- 16 x 1 bolts and five
3
/
8
- 16 lock nuts as
shown on drawing.
3. Attach the attachment lift to attachment mount (Ref 3) using clevis pin and bridge pin (Ref 5 and 6).
4. Lift attachment lift up or extend cylinder so rod end (Ref 8) lines up with the holes on the center of the
attachment lift. Use
5
/
8
x 2
1
/
2
clevis pin and bridge pin (Ref 6 & 7) to fasten
cylinder to cultivator.
5. Turn machine on and test for proper operation.
- Super Star LE 42-400-A (sn 400121 – 400150) Parts & Service Manual Super Star LE 42-400-A (sn 400216 – 400355) Parts & Service Manual Super Star LE 42-400-A (sn 400171 – 400215) Parts & Service Manual Super Star LE 42-400-A (sn 400151 – 400170) Parts & Service Manual Super Star LE 42-400-A (sn 400110 – 100120) Parts & Service Manual Super Star LE 42-400-A (sn 400100 – 100109) Parts & Service Manual