beautypg.com

Venting installation instructions, Continued – Desa (V)VC42N SERIES User Manual

Page 11

background image

11

11

www.desatech.com

116236-01B

Figure 15 - Horizontal Termination Configuration for Corner Installation Using One 90° Elbow

Square

Termination

Wall

Firestop

Not to Exceed

(H) Limits

As Required for (V)

See Chart for Pipe

Section Required

45°

Elbow

90° Elbow

90° Elbow

Square

Termination

Wall

Firestop

45° Elbow

12" Minimum

CORNER INSTALLATION
Recommended Applications:
• Corner ground floor installation
• Ground floor installation where pipe vents horizontally through wall

(over 12" horizontal pipe)

• Basement installation where one foot clearance from ground to

termination is possible

SNORKEL TERMINATION INSTALLATION
Recommended Applications:
• Installations requiring a vertical rise on building exterior
• Any installation using snorkel termination to achieve one foot above ground
Snorkel terminations are available for installations requiring a vertical rise on the exterior of the building. If install-

ing snorkel termination below grade, you must provide proper drainage to prevent water from entering snorkel

termination (see Figure 16). Do not back fill around snorkel termination.

VENTING INSTALLATION

INSTRUCTIONS

Continued

VENTING INSTALLATION INSTRUCTIONS

Installation Planning (Cont.)

12"

Minimum

Snorkel Termination

12"

Minimum

Snorkel

Termination

Wall

Firestop

90° Elbow

45°

Elbow

Figure 16 - Snorkel Termination Configurations for Below Ground Installation

Required

Vertical (V)

Vertical Pipe Horizontal (H)

*43

1

/

2

" min.

None

30" max.

54

1

/

2

" min.

1 ft.

48" max.

66

1

/

2

" min.

2 ft.

60" max.

78

1

/

2

" min.

3 ft.

84" max.

90

1

/

2

" min.

4 ft.

20' max.

* Ground Floor Corner Venting

Not to Exceed

(H) Limits

12"

Minimum

Snorkel

Termination

Adequate

Drainage