Methven Tahi Satinjet Shower System User Manual
Page 5
![background image](https://www.manualsdir.com/files/798227/content/doc005.png)
Ensure the deeper precision bored end connects to the overhead arm of
shower. This forms a watertight seal with the ‘O’ ring on the shower arm
as per illustration on Page 4. Install backnut and adjust dimension to suit
connection type as shown above. Seal the wall lining with silicone sealant
Set bracket aside, drill clearance
into lining then pre-drill support
Ensure edge is plumb, mark plumb
line to floor and mark screw holes
Seal holes. Drive in screws (and
wall plugs where appropriate). Clip
on covers
1
2
3
(R
ecommended
) 2010mm
Backnut (Supplied)
Connection bar
FLOW
25mm (Max.)
Finished wall lining
ø 25 ±3mm
Elbow outlet 8.5 ±1.5mm
Overhead outlet 16 ±3mm
Deeper precision
bored end
3
This manual is related to the following products: