Optional – Methven Tahi Satinjet Shower Kit User Manual
Page 2
Mark top screw hole. Mark plumb-line
to floor and then mark lower screw
hole 1082mm from upper mark. Drill
holes for screws.
1.
2.
3.
4.
6.
5.
7.
Seal holes. Drive screws through
mounting bosses into the load-
bearing support on wall (and wall
plug if appropriate).
Release lever and slide shelf (if
included) and handset holder on to
top of rail.
Ensure bracket caps are fitted as
shown and push brackets into rail top
and bottom.
Push rail assembly firmly onto
mounting bosses.
Tighten grub screws with provided
hex key.
Attach hose & insert trays. Adjust
shelf position & handset tension, see
over leaf for instructions.
A
B
dESIRE
d HEIGHT
1082mm
Bracket caps
OPTIONAL
Rail brackets
Bracket caps
mounting bosses
Rail
Handset holder
Handset
Hose elbow
Hose
Single shelf
double shelf
Fastening Zone
– load-bearing
support required
Appr
ox max us
abl
e
height abo
ve scr
ew - 7
0mm
Fastening Zone
– load-bearing
support required
NOTE - Elbow and rail height at installers discretion
to comply with local standards.