beautypg.com

Putting into operation, Installing the tcr510pci in your computer, Power supply – Meinberg TCR510PCI User Manual

Page 12: Input signals

background image

12

Putting into operation

To achieve correct operation of the board, the following points must be observed.

Installing the TCR510PCI in your Computer

Every PCI board is a plug&play board. After power-up, the computer's BIOS assigns
resources like I/O ports and interrupt lines to the board, the user does not need to take
care of the assignments. The programs shipped with the board retrieve the settings from
the BIOS.

The computer has to be turned off and its case must be opened. The board can be

installed in any PCI slot not used yet. The rear plane must be removed before the board
can be plugged in carefully. The computer´s case should be closed again before
restarting the computer.

Power supply

All power supplies needed by TCR510PCI are delivered by the PCI bus.

Input signals

Amplitude modulated IRIG-A/B or AFNOR codes must be connected to the BNC-jack
in the bracket of TCR510PCI. A shielded or a twisted pair cable should be used.

Pulse width modulated (DC Level Shift) signals are applied by using the D-Sub-plug.

Two DIP-switches must be set to the ‘ON’ position for connecting the contacts of the D-
Sub with the onboard photocoupler.

The IRIG code used must be configured with the monitor software.

The board TCR510PCI can’t be used to decode amplitude modu-
lated and DC Level Shift signals simultaneously. Depending on the
selected code, only the signal at the BNC-jack or the D-Sub con-
nector is decoded.