beautypg.com

Installation – Desa SMS24 User Manual

Page 7

background image

www.desatech.com

117536-01B

7

CHECKING GAS CONNECTIONS

WARNING: Test all gas piping

and connections, internal and

external to unit, for leaks after

installing or servicing. Correct

all leaks at once.

WARNING: Never use an open

flame to check for a leak. Apply a

noncorrosive leak detection fluid

to all joints. Bubbles forming show

a leak. Correct all leaks at once.

PRESSURE TESTING GAS SUPPLY
PIPING SYSTEM
Test Pressures In Excess Of 1/2 PSIG
(3.5 kPa)
1. Disconnect log set and its individual equipment

shutoff valve from gas supply piping system.

2. Cap off open end of gas pipe where equipment

shutoff valve was connected.

3. Pressurize supply piping system by either us-

ing compressed air or opening main gas valve

located on or near gas meter.

4. Check all joints of gas supply piping system.

Apply noncorrosive leak detection fluid to gas

joints. Bubbles forming show a leak.

5. Correct all leaks at once.
6. Reconnect log set and equipment shutoff

valve to gas supply. Check reconnected fit-

tings for leaks.

Test Pressures Equal To or Less Than
1/2 PSIG (3.5 kPa)
1. Close equipment shutoff valve (see Figure 5).
2. Pressurize supply piping system by either us-

ing compressed air or opening main gas valve

located on or near gas meter.

INSTALLATION

Continued

Figure 5 - Checking Gas Joints

Gas Meter

Equipment Shutoff Valve

Burner Orifice
(Factory Installed)

Burner Inlet Venturi
(Attached to Pan
Bottom)

Gas Connector
Tube

Figure 6 - Connecting Gas to Appliance

Adapter
Fitting

Burner Inlet Fitting
(Factory Installed)

3. Check all joints from gas meter to equipment

shutoff valve (see Figure 5). Apply noncorro-

sive leak detection fluid to gas joints. Bubbles

forming show a leak.

4. Correct all leaks at once.

HEARTH KIT ASSEMBLY AND
INSTALLATION

Kit Assembly - Ramp Pan Burner
1. Determine which side the gas line feeds into

the fireplace. This log set is factory set up for

right side (facing) gas feed. If your gas line is

on the right side, go to the Installation and Gas

Connection

section below. If your gas line is

on the left side of the fireplace, proceed with

steps 2 through 4 below. Note: Pilot kit can

only be installed on the right (facing) side.

2. Remove the nuts securing the gas inlet venturi

to the bottom of the burner (see Figure 6).

3. Remove the venturi from the pan taking care

not to damage the gasket between the venturi

and the pan.

4. Reverse the direction of the venturi and re-attach

to the bottom of the pan using factory nuts.

Installation and Gas Connection
1. Place the ramp burner assembly in the center

of the fireplace floor. Make sure the front of

pan faces forward.

2. Thread the gas supply fitting to the fireplace

gas supply pipe. Use thread sealant.

3. Install the gas connector tube to the gas supply

fitting. Carefully shape tube to attach to adapter

fitting. Be careful not to cause kinks in tube.

4. Attach opposite end of gas connector tube to

the gas inlet fitting on the end of the venturi.

This manual is related to the following products: