beautypg.com

Caution – Kussmaul Electronics 091-60A User Manual

Page 4

background image

LOAD MANAGER SETTINGS

The standard setting on Load Manager Mark II may not be optimum for all applications. The
Configuration Switch , S6, sets the initial time delay and the initial shed voltage for the unit. On the
Configuration Switch, levers 1-3 are used for time settings. Levers 5 and 6 are for voltage
settings.

To prevent false voltage readings, the Load Manger Mark II, delays the shedding or adding of
loads. The initial delay time is factory set for four seconds. By adjusting levers 1-3 on the
Configuration Switch, the user may vary the initial time delay from 2 to 16 seconds. Figure 1 below
indicates how to alter the initial delay time.

Subsequent time delays for additional load shedding is factory set for 2 seconds and is not
adjustable.

Load Reduce will start at the Initial Shed Voltage. The Factory Setting, for the Initial Shed Voltage,
is 12.3VDC. For the first load to go off, the voltage must be 12.3 VDC or lower for the duration of
the time delay. Recovery, that is reapplication of a load will not occur until the voltage is .2 VDC
higher than the shed voltage. A time delay prevents the instantaneous operation of the output
relay. After shedding the first load the Load Manager waits 2 seconds before making a decision
to shed more loads. If the sensed voltage is .2 volts less than that at the previous shed point and
maintains this lower voltage for 2 seconds, the next load will be shed. This continues until
sufficient loads are shed so that there is no further decrease in sensed voltage. Figure 2 below
indicates the switch settings required to vary the Initial Shed Voltage. Loads are reapplied when
the voltage rises and is maintained for a suitable time.

Lever 1

Lever 2

Lever 3

Time Delay

on

on

on

2±.5 sec

off

on

on

4±.5 sec

on

off

on

6±.5 sec

off

off

on

8±.5 sec

on

on

off

10±.5 sec

off

on

off

12±.5 sec

on

off

off

14±.5 sec

off

off

off

16±.5 sec

Changes to Configuration Switch, S6, will only take effect during power up. Remove power from
pin one of Load Manager and reapply to change the setting on the Load Manger Mark II.

Switch 4 Switch 5

Initial Shed Voltage

on

on

12.30±.1

off

on

12.15±.1

on off

12.00±.1

off

off

11.85±.1

Factory Setting

Figure 1
Configuration Switch, S6, InitialTime Delay Settings

Figure 2
Configuration Switch S6, Threshold Voltage Setting

Factory Setting

CAUTION