2.3 Connection to mains

FastMig KM power sources are connected to the 400-V three-phase network using the mains

cable supplied with the machine.
The machine is equipped with a five-metre mains cable that does not have a plug. Before use,

check the mains cable and install a mains plug. If the cable does not comply with the local

electrical regulations, replace it with a compliant cable. See ’Technical specifications’.

NOTE!

The mains cable or plug may be installed or replaced by only an electrical contractor or

installer authorised to perform such operations.

Replacement of the mains cable

1.

Unscrew the mounting screws on the top and sides of the machine, and remove the case

by lifting it.

2.

Disconnect the phase leads from connectors L1, L2, and L3, and disconnect the

protective earth lead.

3.

Pass the cable to the machine through the inlet ring at the rear of the machine, and

secure the cable with a cable clamp.

4.

Connect the cable’s phase leads to connectors L1, L2, and L3.

5.

Connect the yellow-green protective earth lead to its connector .

NOTE!

Do not connect the zero lead if you are using a five-lead cable.

The table below lists the fuse sizes for 100% load in a 400-V three-phase network with

4 x 10-mm² cable for different power source models.

Model

Fuse

KM 300

20 A delayed

KM 400

25 A delayed

KM 500

35 A delayed

2.4 Welding and earthing cables

The device has a welding cable connection both in the front and in the rear. The positions of

the welding and earthing cable connections are shown earlier in section ‘Introduction’.
The welding cable type to be used is rubber-insulated copper cable. The recommended cross-

sections of the cables for different power source models are as follows:

Model

Cross-section

KM 300

50 – 70 mm²

KM 400

70 – 90 mm²

KM 500

70 – 90 mm²

The table below shows the typical load capacities of the cables when the ambient

temperature is 25 °C and the lead temperature is 85 °C.

Cable

Duty cycle (ED)

Voltage loss / 10 m

100 %

60 %

35 %

20 %

50 mm²

285 A

316 A

371 A

458 A

0,35 V / 100 A

70 mm²

355 A

403 A

482 A

602 A

0,25 V / 100 A

95 mm²

430 A

498 A

606 A

765 A

0,18 V / 100 A

120 mm²

500 A

587 A

721 A

917 A

0,21 V / 100 A

NOTE!

Do not overload the welding cables, as an overload may cause voltage loss and

overheating.

Connect the earth clamp directly to the work piece in such a way as to maximise the contact

surface of the clamp. The point of connection must be unpainted and free of corrosion.

FastMig KM 300, 400, 500

6