Network switch cord management, Installing switchair – Geist SA2-006 User Manual
Page 2

Geist Americas
Geist Europe
Geist Asia
Geist DCiM
China
Hong Kong
800.432.3219
1.877.449.4150
+44 (0) 1823 275100
+86.755.86639505
+852 90361927
geistglobal.com
geistglobal.com
geistglobal.com
geistglobal.com
geistglobal.com
Network Switch Cord Management
STEP 1 Before installing SwitchAir, insure that a full two RU of rack space is open directly
above the device to be cooled. The unit will alternatively mount below the switch in which
case a full two RU of rack space must be open below the switch.
Installing SwitchAir
STEP 2 Install support rail and air channel above or below device in the 2 RU of dedicated rack space.
STEP 3 Slide chassis between rail and air channel and attach to
rack used cage nuts and screws. Plug chassis power cord into
power distribution unit. Installation is now complete
Rail
Channel
Rail
Chassis
10002901