Geist SA1-03001 User Manual
Opengate installation guide, Switchair 3u installed in rack
SA1-03001 Specifi cation
Chassis Depth
7”
Channel Length
27.5”
Airfl ow
Switch Generated (Passive)
Switch Intake/Exhaust
Side/Side-Rear
Warranty
Lifetime
Network Switch
SwitchAir
Cool Air Delivery
Rack Front
Rack Rear
SwitchAir 3U Installed in Rack
Opengate Installation Guide
SA1-03001 SwitchAir
For Side Air Intake Switches
Installation Precaution:
• Install SwichAir such that the required airfl ow for safe operation of
equipment is not compromised.
• Take precaution to avoid interference with the switch input power
cords when installing on a live unit.
Delivers cool air to network switches with side air intake.
Installs in minutes while network switch is live.
Why Choose Opengate?
• Stabilize your switch intake air
temperature to within a few degrees
of the rack front intake air temperature
• Installs in minutes and works with
most side and rear intake network
switches
• SwitchAir 3U can be installed while
network switch is operational
• SwitchAir 3U ensures the network
switch is able to receive the required
cool air from outside the rack
• Network switch pulls air through
the SwitchAir Chassis
10001701