Operation, 1 installation, 2 setup – Fluke Biomedical 6000-530B User Manual
Page 11
Operation
Installation
3
3-1
CAUTION
Section 3
Operation
3.1 Installation
Ensure all power is removed prior to installing the
Model
6000-530B Ion Chamber.
Installation of the Model 6000-530B consists of connecting the optional preamp to the host equipment, if
desired, providing an electrical interface to the ion chamber, and performing a calibration. A handle is also
included with the ion chamber for placing the ion chamber in the spot film tray of an image intensifier
assembly.
Electrical Interface
Final electrical interface connections between the preamplifier, the Ion Chamber, and the host instrument
are listed in Table 3-1, and are shown in the applicable drawing number 6000-530B for the Model 6000-
530B Ion Chamber
Table 3-1. Electrical Interface Connections
Connector
Description
BNC
Ion Chamber Output
HV (BIAS)
Ion Chamber High Voltage
3.2 Setup
Because the Model 6000-530B Ion Chamber may be used with many commercially available
electrometers and dosimeters, please refer to the applicable instrument manual for set up and calibration.