beautypg.com

Dayton natural gas construction heater, 3vg78, Maintenance (continued) – Dayton 3VG78 User Manual

Page 6

background image

Dayton Operating Instructions and Parts Manual

3VG78

6

®

Dayton Natural Gas
Construction Heater

Figure 6 - Fan, Motor Shaft, and Setscrew
Location

Figure 7 - Fan Cross Section

FAN

IMPORTANT: Remove fan blade from
motor shaft before removing motor from
heater. The weight of the motor resting on
the blade could damage the fan pitch.

1. Remove upper shell (See Upper Shell

Removal).

2. Use hex wrench to loosen setscrew

which holds fan blade to motor shaft
(See Figure 6)..

3. Slip blade off motor shaft.
4. Clean blade using soft cloth moistened

with kerosene or solvent.

IGNITOR

Make sure gap between ignitor electrode
and burner nozzle is .13" min./.15"max.
Access ignitor electrode from inside
combustion chamber. No other mainte-
nance is needed for ignitor.

Never attempt to
service heater

while it is plugged in, connected to
natural gas supply, operating, or hot.
Severe burns and electrical shock can
occur.

SERVICE PROCEDURES

UPPER SHELL REMOVAL

1. Remove screws along each side of

heater. These screws attach upper and
lower shells together (See Figure 5).

2. Lift or slide upper shell off.

3. Remove fan guard.

Figure 5 - Upper Shell Removal

5. Dry blade thoroughly.
6. Replace fan blade on motor shaft. Make

sure setscrew is touching back of flat
surface on motor shaft (See Figure 7).

7. Place setscrew on flat of shaft. Tighten

setscrew firmly (40-50 inch-pounds).

8. Replace fan guard and upper shell.

FAN

LP-PFA/P 023

Fan Blade

Setscrew

Motor
shaft

FAN CROSS SECTION

LP-PFA/P 013

Hub

Setscrew

Motor Shaft

Fan

Maintenance (Continued)