beautypg.com

Uilt, Nsert, Nstallation – Dansons Group IPP User Manual

Page 20: Horizontal vent installation exterior wall

background image

Can

adian Comfort Industries V04

20

PELPRO OWNERS MANUAL

Copyright 2004

www.pelprostoves.com

Dansons Group Inc.

4

18”

8”

6”

Wood Frame
Construction

Stand Offs

Part ACI-3HZ

6”

2” Min.

Air gap

Horizontal Vent Installation

Exterior Wall

Wood Surround

Shroud

3” minimum

air gap

Wall Band /

Support Brkt

every 5’

Clean Out Tee

10’

2’

B

UILT

-I

N

I

NSERT

I

NSTALLATION


CAUTION: DO NOT BLOCK VENT OPENING

The PELPRO Insert may be framed directly into a wall as either a horizontal or vertical vent installation see (figure
27, 28). The exhaust installation requirements are the same as for a freestanding stove. Refer to “Installing your
Freestanding Stove” for information concerning installation and proper hook-up of the exhaust.

NOTE: Built-In Installations require Enclosure

Kit #ACI-3HZ Horizontal Vent or #ACI-3VL Vertical Vent.

Dimensions that will be enclosed within the frame work are:














This example shows the
exhaust venting out and
up vertically


Requires Spacer Kit
#ACI-3HZ

The framed opening for this
Installation needs to be:


Tradition Bay View
Height 21”

21 - 25”

Width 30”

30”

Depth 17”

17”



If constructing a chase, adequate
Insulation, vapor barrier, drywall,
And caulking must be used.


FIGURE 27

24”

18 3/4”

Shroud 1”

+

+

6 1/2”

7 3/4”

8 1/4”

3 ½”

Exh au st

Air Inlet

24”

24 3/4”

12 1/4”

10 3/4”

Traditional Insert / Built-In

24”

19”

-
23”

Shroud 1”

12 1/4”

10 3/4”

+

Exhaust

26”

+

24”

6 ½”

Exhaust

+

Air Inlet

8 1/4”

7 3/4”

3 ½”

Bay View Insert / Built-In

Adjustable
Hopper

This manual is related to the following products: