beautypg.com

Preparation, Ventilation ( ( ( ( ( figure b – Caple RiR121 User Manual

Page 6

background image

Ventilation

Figure B

*Level the kitchen cabinet unit with a spirit level and a try square. Level the unit by placing

packing material underneath if required.

*A minimum gap of 38mm must be maintained at

the back of the appliance for ventilation.

*Air inlet A must be at least 200 cm square and

air must flow through the panel in the cabinet

plinth.

*Check that the position of the power socket (1)

is correct. AC voltage in the location at which

the appliance is to be used must comply with

that as shown on the data plate located on the

left inside wall of the appliance next to the

vegetable bins. The power supply must be

suitably earthed.

9. Remove and replace component (10), at the corresponding position on the left, with the

special tool provided.

10. Fix component (7) in the corresponding opposite position.

Preparation

(Figure A)

(Figure B)

5