BUG-O Systems CWP-5 User Manual
Page 35
![background image](https://www.manualsdir.com/files/776707/content/doc035.png)
35
INSTALLING CARRIAGES AND MACHINES ON THE MONORAIL
Assemble carriages and put them on the rail.
The CWP-5 welder is put on the carriage that is nearest to the welding power source and the CB-1P
cutter nearest to the plasma power source.
Put the CB-1P cutter machine on the 8" pipe in the stands and bring the carriage to the machine. Lower
the shaft coupling over the main shaft on the cutter. Ensure that shaft is fully inserted into the shaft
coupling. Rotate the machine so that the plasma leads are in front and parallel to the carriage and tighten
the set screws in the shaft coupling to secure the main shaft to the vertical slide assembly.
Next put the CWP-5 welder on the 8" pipe and bring its carriage to it. Lower the shaft coupling down over
the main shaft. Rotate the machine so that the welding lead on top of the machine will be on your left.
This will put the electrical connector on the right. Tighten the set screws in the shaft coupling to secure
the main shaft to the vertical slide assembly.
It is important for the machines to hang plumb. Left to right adjustments are made by loosening the two
bolts that connect the shaft coupling to the vertical rail. Front to back adjustments are done by adjusting
the position of the vertical rail support plate. Move the plate by adjusting the eight nuts on the four studs.
Note: Once machines are plumb verify that the machines are centered over the pipe stand.
SET-UP INSTRUCTIONS FOR CWP-5 / CB-1P USED IN SPRINKLER FABRICATION
CARRIAGE ADJUSTMENT
Front To Back Adjustment
Front To Back Adjustment
Front To Back Adjustment
Front To Back Adjustment
Left To Right Adjustment
Vertical Rail
Vertical Rail Support Plate
Shaft Coupling