0 operation – Broadata Communications 200E-CC User Manual
Page 7

BCI 200E-CC/200E-CCP User’s Manual
Universal Fiber Optic Card Cage System
Broadata Technical Support, (800) 214-0222
8
If you have any problems or concerns, regarding the installation,
make sure that you have taken the proper steps to ensure a
proper power connection. Otherwise, feel free to contact us for
any questions you may have.
3.0 OPERATION
After the installation procedure is completed, the units are ready for
operation. To operate the BCI 200E-CC/200E-CCP units, simply apply
power as indicated in the previous step.
This manual is related to the following products: