Before installation – Blu Bathworks LF1062 User Manual
Page 4

2014-01
1 866 907 0122 blubathworks.com
®
3
Before Installation
TOOLS NEEDED:
– 12” Pipe Wrench
– 10” Adjustable Wrench
– Carpenter’s Level
– Tape Measure
– Pliers
– Screwdriver
– Putty Knife
– Drill
– 1
1
⁄
64
” drill bit for wood floor installation
–
5
⁄
16
” drill bit for concrete/tile installation
MATERIALS REQUIRED:
– Flexible Supply Tube / Connector
– Supply Stop Valve
– Mounting (T) Bolts & Nuts (2pc)
– Wax Ring / Seal
PACKAGE CONTENTS:
Item
Description
Quantity
1
Bowl w/ lid (vitreous china)
1
2
Cover Plate
1
4
Top Mount Bolt Set (for seat)
1
5
UniFit Rough-In
a. Toilet Mounting Bolt (T-Bolt)
2
b. T-Bold Washer
2
c. T-Bolt Nut
4
d. Mounting Screw w/ washer
4
e.
Anchor
2
f. PVC Outlet Connection
2