beautypg.com

Check fiber ends, Assemble connector body – BECKHOFF II/O-Lightbus User Manual

Page 8

background image

Eiserstr. 5, D-33415 Verl, Germany, Phone +495246/963-0, Fax +495246/963-149

7

Optical fibre installation instructions

II/O-Lightbus


5. Check fiber ends

Visual inspection

Simple visual inspection of the abraded fiber ends:
If one cable end is presented to a light source, then a clean, plane face
without cracks must be observed at the other end.

6. Assemble connector body

Clamp the Kevlar weave between clamping washer and cutting ring and
insert the cable into the connector body. Follow on with the remaining rings
and secure the connector with the screw fitting.

~31mm