Installation of the pc in the control cabinet, Earthing measures – BECKHOFF C6515 User Manual
Page 11
Installation Instructions
Installation of the PC in the control cabinet
The C6515 Industrial PC is designed for mounting in control cabinets for
machine and plant engineering applications.
The ambient conditions specified for operation must be observed (see
chapter
Preparation of the control
cabinet
The control cabinet must be provided with the relevant cutout (see chapter
i
Note
The clearance above and below the housing must be at least 200 mm
in order to ensure adequate ventilation of the PC.
Warning
Extreme environmental conditions should be avoided as far as
possible. Protect the PC from dust, moisture and heat.
The ventilation slots of the PC must not be covered.
Earthing measures
Earthing measures
Earthing connections dissipate interference from external power supply
cables, signal cables or cables to peripheral equipment.
Establish a low-impedance connection from the earthing point on the PC
housing to the central earthing point on the control cabinet wall, in which
the computer is being installed. The earthing connection is located beside
the power supply connector of the Industrial PC (see chapter
C6515
9