Post installation checkout, Display control, Avionics innovations, inc – Avionics Innovations FPD 10 (Flat Panel Display) User Manual
Page 9

POST INSTALLATION CHECKOUT
1. Inspect monitor for any physical damage.
2.
Check monitor for proper operation
Note: Panel will not power up until a video signal is applied.
Display Control
UP
PWR
MENU
DOWN
SEL
Five buttons located on the right side of the monitor accomplish the control of the panel
Revision NC 10/4/2002
Page 8
Avionics Innovations, Inc