beautypg.com

Post installation checkout, Display control, Avionics innovations, inc – Avionics Innovations FPD 10 (Flat Panel Display) User Manual

Page 9

background image


POST INSTALLATION CHECKOUT

1. Inspect monitor for any physical damage.

2.

Check monitor for proper operation

Note: Panel will not power up until a video signal is applied.

Display Control

UP

PWR

MENU

DOWN

SEL

Five buttons located on the right side of the monitor accomplish the control of the panel






























Revision NC 10/4/2002

Page 8


Avionics Innovations, Inc