Operating instructions 6 – Pengo MDT Series User Manual
Page 7
![background image](https://www.manualsdir.com/files/769943/content/doc007.png)
OPERATING INSTRUCTIONS 6
Before operating, always ensure that the PENGO Earth Auger Drive Unit and Auger are fitted
correctly to the parent machine. (Refer to Set up Instructions Pg 5).
CAUTION: Do not operate on excessive slopes, embankments or near edges of excavations.
When travelling or manoeuvring Parent Machine to the required drilling area, reduce ground speed
to prevent the Earth Auger Drive Unit and Auger from swinging.
NOTE: Some mounting Frames are fitted with a support
bracket. When fitted ensure support bracket locates the
Earth Auger Drive Unit and Auger during travelling or
manoeuvring (See Photo, Typical for Skid Steer Loaders)
To commence drilling, locate Auger Pilot (on pre marked spot)
and engage machine auxiliary lever to rotate the Auger in a
clockwise direction.
Lower the machine arm(s) to push the Auger into the ground. The harder the ground the more down
pressure you will need.
NOTE: Do not continually stall the Earth Auger Drive Unit. Continual stalling may cause excessive
heating of the hydraulic system.
As the Auger digs into the ground , the machine arm(s) may travel through an arc. You may therefore
have to continually reposition the Earth Auger Drive Unit or Parent machine to drill vertically.
Do not drill the Auger deep into the ground in one operation. Continually clearing the hole during
drilling will facilitate a faster and easier operation.
NOTE: Extension shafts are available for extra depth.
Disengage machine auxiliary lever and rest Earth Auger Drive Unit and Auger on the ground before
making any adjustments or leaving the Parent Machine.